Select Spray Systems was hired by a general contracting firm to perform the spray-applied fireproofing on the $134 million UMASS Dartmouth P3 project. The overall job consisted of two new residence halls totaling 267,000 SF with 1,210 beds and a 39,500 SF dining hall with an 800-person capacity.
top of page
bottom of page
Comments